Wednesday, 4 December 2024

Sizewell B never insured

Nuclear could kill us all

In the UK major engineering plants need for planning consent.  Sizewell A I did have planning consent.  But Margaret Thatcher exceeded her plasma as UK prime minister, by a line there nuclear constructors two bills Sizewell B as an illegal extension to Sizewell A.

Sizewell A was taken out of service 2006.  Annie is operating insurance suspended.  Sizewell B never had its own royal commission and are planning consent.  It was never a legal engineering construction.

So it is gone through all the its operating life, without planning consent all valid insurance.  They fine for missing insurance is a cumulative sum of although missing insurance.

100 billion a year since 2010, as Japan experience the Fukushima incident in Tokeo.  The legal insurance was 40 billion a year since Chernobyl in 1986.  Sizewell operating since 1984.  For the first two years of illegal operation in carers a legal fine of 80 billion.

The next 22 years in carers a legal fine or 2.2 trillion.  There is no grounds to appeal a planning consent fine.  The insurance problem means that no nuclear plant will ever be constructed in the UK.

The annual insurance being 100 billion, burn 80 million annual operating profit.  The greatest used loss making concern in UK history.

Nuclear power is very vague about carbon dioxide affecting the weather.  Totally ignoring its own huge carbon emissions June plant construction.  Combine a fossil fuel burn on limestone to make all the cement for its reinforced concrete.

Releasing in two years the carbon equivalent from operating a commercially fired power plant for 25 years.  After 25 years we have to demolish the nuclear plant!  Or it does A predictable Fukushima.

All 200 nuclear plants in France each needs annual insurance cover of 129 billion a year as a year.  Without that insurance cover the French nuclear plants also a form an immediate shutdown and never restart.

No comments: