Showing posts with label Sizewell. Show all posts
Showing posts with label Sizewell. Show all posts

Saturday, 14 June 2025

All nuclear under insured

Nuclear power = not insurable

Since Fukushima in 2010 every operating uranium nuclear power fund in the world had you cut on your insurance cover of 100 billion. So each other nuclear plants in France America require the same insurance co of 100 little billion. which is not commercially available!

every 25 years somewhere around the world a fresh eyes water reactor Experiences a trivial meltdown. Prerequisite for nuclear funds are operate is sufficient insurance cover.

Since the windscale reacted incident in 1978 nucleophile has carried just 50 million of annual insurance for every nuclear power plant.

1986 Ukrainian nuclear experienced the Chernobyl incident. And the lawyers judge that the required insurance for any nuclear fire hunt was 40 billion. Not commercially available.

so nuclear resiliency to thriving international nuclear regulators. The biggest culprit crowd in history! So the 200 Nuclear firms in the US and France have been criminally underinsured since 1986.

so it will a only carried the 50 million of insurance cover just sufficient before Windscale. The Sizewell B Yet it was filled as an illegal extension to the existing Sizewell A.

BBC

https://www.bbc.co.uk › news › articles

Approval given for Sizewell A to be demolished - BBC News

16 Aug 2024 · Site director Alan Walker said Sizewell A had been decommissioned "safely, securely and sustainably". The twin reactors were shut down on 31 December 2006 after 40 …


Sir even not currently insufficient insurance cover Never have ride to the distinct Sizewell B. can you tell us this even though we are fascinated to say how long he is that Margaret Thatcher thought to circumvent the legal requirement for a full Royal Commission on the building our Sizewell B.

As British nuclear fully aware that the UK public would always reject the building of a nuclear plant.

There is simply no need! as a Columbia University Historic oh have demonstrated ultrasound sets off nuclear fusion in liquid water. A cover zero Non nuclear process.

1 H20+US → 2(E2+L+X-ray) So ultrasound converts regular water into just heat light and X rays. By firing up a steam plasma In the water!

I found this at 2003 on my Ph D work where Professor Z. who is now professor Zimmerman CBE. Now a citizen of the British Empire.Senna legally confirmed to tell the House of Lords climate people That the rest non-nuclear energy system is a steam plasma.

A 30x1.5cm steam plasma releasing a constant one megawatt of carbon 0 heat. A 12,000 found steam turbine will convert into half a megawatt 3 phase means AC current.

Generator a monthly income from the national grid of 30,000 nuclear pounds. So we pay off the 12,000 UK found cost of the turbine the first month.

Alternatively the home user could fire up a 15x15cm regular steam plz and generate a non nuclear £13,000 of monthly income from the national grid. We can hire a sixty-five kilowatt thermal electric generator For just 125 UK fans a month. And we're getting a more income of 15,000. Sweat! For Calvin zero heat and electricity.

The oil and gas only generates 45 kilowatts of heat. So costly and energy deficient ! So we generate the government zero electrical fire for between 8 and 40 houses. Do you have any on daily demand!

And we feature no fossil fuel then so no carbon dioxide generation. And the prophet is under the legal imperative to raise this issue the House of Lords climate people. In France all 200 nuclear reactors require the same hundred billion of annual insurance cover.

Not commercially available anywhere in the world! EDF has been operating currently under insured nuclear facilities since Chernobyl in 1986. The standard legal file is a cumulative sum of all the missing insurance cover over the years.

In the Earth we are also dealing with two 100 grimly under insured nuclear power plants.On the nuclear regulators are under the legal inflative to issue immediate stock orders on any undinsured nuclear facility on Earth.

As of May 2023, there are 436 operable nuclear power reactors worldwide. This table lists all currently operational power stations. Some of these may have reactors under construction, but only current net capacity is listed.

And before any nuclear front could start up it requires 100 billion of annual insurance cover. not available even to governments! Certainly not a commercial operators!

the construction consortia for any future nuclear plant must immediately stop all activities. the nuclear plant could never get adequate insurance cover so could never commence operations anywhere in the world.

now esteem plasma is a mass of the dynamic Caravan zero non-nuclear energy system. 80 times as don't like and totally non-toxic compared to nuclear operations. they try outside the Eagle Insurance cover anyway.


The US fleet is operated by 30 different power companies across 30 different states

Wednesday, 4 December 2024

Sizewell B never insured

Nuclear could kill us all

In the UK major engineering plants need for planning consent.  Sizewell A I did have planning consent.  But Margaret Thatcher exceeded her plasma as UK prime minister, by a line there nuclear constructors two bills Sizewell B as an illegal extension to Sizewell A.

Sizewell A was taken out of service 2006.  Annie is operating insurance suspended.  Sizewell B never had its own royal commission and are planning consent.  It was never a legal engineering construction.

So it is gone through all the its operating life, without planning consent all valid insurance.  They fine for missing insurance is a cumulative sum of although missing insurance.

100 billion a year since 2010, as Japan experience the Fukushima incident in Tokeo.  The legal insurance was 40 billion a year since Chernobyl in 1986.  Sizewell operating since 1984.  For the first two years of illegal operation in carers a legal fine of 80 billion.

The next 22 years in carers a legal fine or 2.2 trillion.  There is no grounds to appeal a planning consent fine.  The insurance problem means that no nuclear plant will ever be constructed in the UK.

The annual insurance being 100 billion, burn 80 million annual operating profit.  The greatest used loss making concern in UK history.

Nuclear power is very vague about carbon dioxide affecting the weather.  Totally ignoring its own huge carbon emissions June plant construction.  Combine a fossil fuel burn on limestone to make all the cement for its reinforced concrete.

Releasing in two years the carbon equivalent from operating a commercially fired power plant for 25 years.  After 25 years we have to demolish the nuclear plant!  Or it does A predictable Fukushima.

All 200 nuclear plants in France each needs annual insurance cover of 129 billion a year as a year.  Without that insurance cover the French nuclear plants also a form an immediate shutdown and never restart.

Wednesday, 3 April 2024

Sizewell never insured

Sizewell B was built as an illegal extension to Sizewll A.  Operated by the French EDF.

EDF is interesting as it operates 200 nuclear plants in France.  And since Fukushima in 2010 the required annual insurance cover by uranium nuclear power plant has been set at 100 billion.  Massively in excess of the maxilla insurance available on earth, at just one billion.

Sizewell 'B' is a Pressurised Water Reactor (PWR); the first of its kind to be constructed in the UK. John Laing plc were awarded the contract for the main civil engineering work on 19th May 1987. Sizewell 'B' was completed in 1995, after 8 years of construction, and is operated by EDF

So EDF for the has been 2,000,000,000,000 and uninsured since 2010.  And the French nuclear regulator has the legal imperative to shut down any nuclear company operating without adequate insurance.

Thus EDF has been prohibited from nuclear construction programmes since Chernobyl in 1986.  When the required insurance was set at 40 billion.  So according to the UK legal system, EDF has been legally prohibited from managing a uranium nuclear plant since 1986.


When constructed it was after the Chernobyl incident.  When the required annual insurance cover there was an impossible 40 billion.  Every day he has plant operation has been illegal and at variance with the UK and European planning laws.

But even the queen of England had to obey while still alive.  And everyone he is subject to UK planning restrictions.

When I met the nuclear regulator in 1984, he assure you that every nuclear facility must have legal operating insurance to operate.  That was just two years before Chernobyl!

There is no legal defence for having in adequate insurance cover.  Nuclear power will I get the our carbon zero.  They are so not!

In the two years a nuclear power plant construction the contract is use a fossil fuel burn on limestone; cement.  For all their reinforced concrete constructions.  Releasing the Covent of the operation for a commercially fired power station for 25 years.

And Fukushima as demonstrated by the in just year's operation of the nuclear plant at the end of its lifetime.  Of the Christian was operated with be on the 25 years design life.  By the Japanese - so Boselli the medicine engineers in the world.

Size will be is that enter the of its design life.  For of radioactive isotopes, oath and the meeting, as all the beginning to fail!  With a triple core meltdown is imminent.

With them throughout its lifetime the electrons carry on with a free Chernobyl Insurance cover of just 50 million.  By a number of plucked out of the of their field for the windscale disaster of the 1970s.

The 480 serious medical situations were caused by windscale.  Which will have resulted in only patient deaths the.  A total legal fine of 48 billion UK pounds.

With making its insurance cover of just 50 million laughably inadequate!  And Sizewill B was an illegal engineering construction.  Which warranted its own royal commission!

It was not as an illegal extension to Sizewell A, then demolished with its totally inadequate insurance cover.  But the as I told King Charles there years ago, the Margaret Thatcher of August rated the greatest have used high our the UK parliament in history.  Of

So last operating nuclear power plant in the UK, has always lacked adequate insurance cover!  Making an annual profit of 80 million.  Needing insurance cover of 100 billion a year.  Which is not available.  And would cost in excess of eight billion.  100 times the plant operating profits.

The usual legal fine for missing insurance is a cure to some of although missing insurance.  Which for Sizewll the insurance fine year's 1.4 trillion.  All the 422 operating nuclear plant so around the world are being somewhere insurance fines.

There are no commercial bank years in excess of one billion.  And when the oil price falls below $100 a barrel of a nuclear power is haemorrhaging cash.

So burn out the nuclear commission consortia, have are the most heavily indebted loss making corporations in economic history.

So EDF with so many is immediate payment of the applying 1.4 trillion for the continued illegal operation of Sizewell.  And must order the immediate suspension of operation of the UK so last operating nuclear plant.

Which is operated every year since 1984 criminally under insured.  The UK has been incredibly lucky!  We can expected a 5050 chance of the UK is a matter of opinion uranium nuclear power plant will experience that the usual triple core meltdown.

All the nuclear power experiences a triple core meltdown somewhere around the world, every 25 years.  In the surviving 422 operating nuclear plants.

The Sizewell operators are playing with nuclear plant for her eyes Asian to increase the power output.  Of the then realizing this increase the chance of a predictable nuclear incident.

So horribly turn down the pressure!  But now Sizewell is do for decommissioning.  And nobody in their right mind would contemplate a Sizewell C.  The nuclear consortia are having realized he lack of adequate available insurance cover.

The UK has been incredibly lucky!  The most dangerous time for a uranium nuclear power plant is as the approach disease 25th birthday.  And everything is bringing to fail!

EDF is clearly impossible situation of needing the usual 100 billion of insurance cover, for all existing 200 uranium nuclear plant's in France.  A country of outstanding natural beauty and tourism.

A nuclear incident and would erase all of that.  With no ever there is no commercially available insurance above one billion!  Each uranium nuclear facility needing 100 billion of annual insurance cover.

For the inevitable nuclear incident!  We can certainly expect a nuclear disaster in France within the next 50 years.  And I used to like holidaying in France, never again.

The U.S. has 200 and uranium nuclear processes and the required insurance cover is trillion.  There is no available insurance of that magnitude.  Making nuclear power the most globally toxic and an insured industry ever.

The generating power costing under five UK pounds per kilowatt hour.  Conventional power generation costing eight UK pounds per kilowatt hour,

But then when I met the nuclear regulator in 1984, I was working for a metals 40 company that died nuclear contracts.  But I left instantly after graduation!

Global academics are prohibited in taking research funding from aninsured organisations.  And the reigning nuclear power is a most under insured industry that will ever exist.  So all the other academic documents on the spurious nuclear power made up of man made global warming or climate change, must be shredded and the minute and digital archived instantly.

That he is the is awarded for the spurious science fiction research, revoked.  The involved individuals losing a high paid engineering work produced from such spurious fiction.

Thursday, 7 December 2023

Sizewell B massively under insured

Nuclear lacked valid insurance since 1986

Sizewell B began operating 1984.  Cleared by the standard nuclear insurance cover of just 50 billion.  The number of deaths caused by Windscale made this insurance cover inadequate.

Their study concluded that because the actual amount of radiation released in the fire could be double the previous estimates, and that the radioactive plume actually travelled further east, there were likely to be 100 to 240 cancer fatalities in the long term as a result of the fire.

The legal fire at for a death is set at 10 million.  So Windscale cost the UK government at least a billion!  Maybe 2.4 billion.  That should have been the insurance set for every nuclear power station in the world.  So 2.4 billion annually!

The legally required insurance for all for 122 nuclear plants in the world.  So in total around 10 trillion.  There is no insurance available above one billion!  So every nuclear power plant in the world has been running criminally under insured since Winscale.

Nuclear operators are liable for the cumulative some of although missing insurance cover!  So 2.4 per year for a nuclear reactor.

Until we got to Chernobyl in 1986, suddenly the required insurance rose to 40 billion.  Andtil Fukushima in 2010.  Which gives us and I it watering 1,866,240 billion Andtil the totally predictable nuclear incident in Japan 2010.

The mass is easier since Fukushima.  Annual insurance cover for a nuclear operator set up 100 billion.  For 13 years!  Which had up to 1.3 trillion.  There is no source of such a huge bank loan!

That is way beyond wall consortia can payout.  It is the same 100,000,000 for a nuclear plant every year into the future.

There is probably know cells are more than that of a of one billion.  Only consortia it do not have that sort of money knocking around!  So every nuclear power plant on earth is running criminally under insured.

As E mailed today by the officer Nuclear Regulation in the UK, regarding my recent blocking on this subject.  Which a copy automatically to European Court of human rights.

Lawyers have the legal powers to enforce an immediate stop and every nuclear power station in the world.  Which obviously will never restart!  So so three day shut down is unnecessary.  Hit the big red button!  Marked 'total plant shutdown'.